Technical Support
current position:Home > News > Technical Support

Preliminary preparation and maintenance specifications of single twister

category:Technical Supportdate:2022-05-30 16:18:24

       Preliminary preparation and maintenance specifications of the single-strand

       1. Enter the post 10 minutes in advance to transfer and change the shift. The handover content is production, equipment, products, materials, mold stools and other conditions. The handover content should be recorded and signed by both parties.

       2. There are two types of ticket, process card and proofreading at the same time, whether the specifications are consistent.

       3. Prepare single line and mold county according to the process card, the single line should be measured with an outer diameter of thousand feet, and the mold should carefully proofread the label.

       4. The core of the receiver shall not be less than 25 times the outer diameter of the stranded wire.

       5. Check that the compressed air valve is open

       6. Adjust the equipment parameter 7 according to the process card, and adjust the tension of the wire plate according to the length of the wire and the weight of the wire plate.

       Single winch equipment maintenance and maintenance procedures

       The operator must master the structural performance and process specifications of the equipment.

       To achieve "three good" and "four meetings" (good management, good use, good maintenance; good use, maintenance, inspection, and troubleshooting).

       Be familiar with the equipment lubrication site and the type of oil used. Each shift must be carried out in accordance with the regulations for oil point lubrication.

       Before starting the rotation site, the equipment should be inspected for faults, tightening screws, fragile parts and limit devices should be specially inspected.

       In the production process, pay close attention to the rotation of the machine tool, if any abnormality is found, stop it immediately, and report it to the maintenance personnel in time. There must be 10 minutes per shift and 1 hour per weekend to clean equipment.

       A level 1 maintenance schedule is carefully done, and screws with good quality butter must be added every month to make them flexible.

       Do a good job in the daily maintenance of equipment, equipment dispatch records.